Piping construction
- Measuring layout in an existing plant. Constructing, creating drawings and production of prefabrication off site.
- Prefabrication and assembly according to the customer's design documentation
- Complete solution with procurement of materials and their prefabrication including non-destructive testing, thermal pre-treatments and post-treatments along specification.
- General execution of the entire implementation of district heating piping and the auxiliary systems
- Assembly and laying of district heating pipes and components